We will deliver the interior side of phase 6 at the end of 2023, winter 2024. The exterior side of phase 6 located on Rosaire Gendron will be delivered in winter/spring 2025.
We will deliver the interior side of phase 6 at the end of 2023, winter 2024. The exterior side of phase 6 located on Rosaire Gendron will be delivered in winter/spring 2025.